Operation
Figure shows SCP with 2 kW and a
removable power cord
BASCP_EN
V05 | 08.2014
Operation
Checking before switching on
► Before switching the coffee machine on, check whether the following conditions have been
met.
Conditions for switching on the coffee machine:
•
The stop valve of the water supply (in machines with a mains water supply) is open / the
drinking water tank is filled with fresh water.
•
The drip tray has been emptied and is correctly inserted / the waste water outlet is correctly
routed / the waste water tank is connected.
•
The bean hopper(s) is/are filled and the locking mechanism is open.
•
The grounds container is empty and inserted correctly.
•
The coffee machine is connected to the mains power supply.
Switching on
Option 1: SCP with 2 kW
► Plug the power cord into the machine.
► Plug the mains plug into the power socket.
► Switch the coffee machine on using the main switch (which can be found on the rear of the
machine near the bottom, next to the power supply connection).
Option 2: SCP Powerpack with 3 or 6 kW
All SCP Powerpack machines are equipped with a permanent cable.
► Plug the mains plug into the power socket.
► Switch the coffee machine on using the main switch (which can be found on the rear of the
machine near the bottom, next to the power supply connection).
Option 3: From Standby mode
► Briefly press the button on the right of the user panel.
The machine starts from Standby mode.
The main screen appears and the machine begins to heat up.
The machine is ready for use as soon as the required temperature is reached.
When the machine is switched on for the first time, a display-guided adjustment of the machine
configurations takes place automatically.
www.schaerer.com
21
Need help?
Do you have a question about the Coffee Prime and is the answer not in the manual?