Removing The Power Unit - Yamaha E115A Service Manual

Hide thumbs Also See for E115A:
Table of Contents

Advertisement

POWR
9. Pull the manual starter handle several
times in the direction of the arrow to
check that the sheave drum turns
smoothly and to check the starter rope for
slack. Repeat steps 3–8 if necessary.
NOTE:
Align the mark f on the stopper with guide,
and then turn the sheave drum.
10. Pull the manual starter handle complete-
ly, then measure the starter rope length.
If the starter rope length is out of specifi-
cation, refer to the step 7 and adjust the
starter rope by rewind times.
Starter rope length g:
(Reference data)
1,700–1,900 mm (66.9–74.8 in)

Removing the power unit

NOTE:
It is recommended to loosen the flywheel
magnet nut before removing the power unit to
improve working efficiency.
5-17
Power unit
f
61U50080
g
61U50090
1. Remove the CDI unit cover, start-in-gear
protection cable 1, then remove the
manual starter and starter pully (MH,
WH).
1
2. Disconnect the negative battery cable 2,
positive battery cable 3 and PTT motor
lead 4.
å
2
3
2
4
å WH, E
∫ ET
69D50160
61U50350
3
61U50360
61U5H11

Advertisement

Table of Contents
loading

This manual is also suitable for:

140b115b

Table of Contents