Yamaha E115A Service Manual page 131

Hide thumbs Also See for E115A:
Table of Contents

Advertisement

3. Install the apron 7, and then tighten the
apron bolt 8 to specified torque.
8
8
7
Apron bolt 8:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
4. Connect the cooling water pilot hose 9
and PCV hose 0.
0
5. Install the manual injection pump cable
end, and start-in-gear protection cable
end, and then install the bracket bolt q.
61U5H11
8
7
8
61U50585
9
61U50335
q
61U50465
6. Install the bushing w and clip e.
7. Connect the choke link rod.
8. Connect the 10-pin main harness coupler
r.
r
9. Connect the shift cable t and throttle
cable y, and then adjust their lengths.
For adjustment procedures, see P3-6,
"Adjusting the throttle cable," and P3-7
"Checking the gear shift operation".
y
t
Crankcase
e
w
6G450905
61U50475
61U50575
5-50
1
2
3
4
5
6
7
8
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

140b115b

Table of Contents