Starting with the elevator side, install
all the guides into the precut holes. A
ashlight can be used to nd the holes.
Make sure they are in line and put a
drop of CA at the base of each.
Close up of the free end sticking thru
the hole in the adjustable link. Don't
worry about the set screw or trimming
at this time.
Rev: 2015.09.18.v01a
Repeat with the rudder side.
Repeat with the other side.
Install the elevator control rod as
shown with the snap link end attached
to the elevator surface horn, and the
free end thru all the guides and also
thru the hole of the adjustable link.
With the servo still centered, also
center the control surface and install
the adjustable link's set screw. Do not
over tighten, doing so will crush the
carbon and make it weak.
page 31
Need help?
Do you have a question about the CRACK PITTS and is the answer not in the manual?
Questions and answers