Section 3 • Scheduled Maintenance Procedures
CHECKLIST D PROCEDURES
9 Check to ensure that each lower bearing
mounting bolt under the drive chassis is torqued
in sequence to specifications. Refer to
Section 2, Specifications.
10
13
6
18
3
11
20
8
16
Bolt torque sequence
10 Swing the engine back to its original position
and install the engine pivot plate retaining
fasteners.
Crushing hazard. Failure to install
the fasteners into the engine tray
to secure it from moving could
result in death or serious injury.
3 - 48
1
15
7
19
12
4
17
5
14
9
2
S-40 • S-45 • S-40 TRAX • S-45 TRAX
D-3
Inspect for Turntable Bearing
Wear
Genie specifications require that this procedure be
performed every 1000 hours or annually, whichever
comes first.
Periodic inspection of turntable bearing wear is
essential to safe machine operation, good machine
performance and service life. Continued use of a
worn turntable bearing could create an unsafe
operating condition, resulting in death or serious
injury and component damage.
Note: Perform this procedure with the machine on a
firm, level surface and the boom in the stowed
position.
1 Grease the turntable bearing. See A-14, Grease
the Turntable Bearing and Rotate Gear.
2 Torque the turntable bearing bolts to
specification. See D-2, Check the Turntable
Rotation Bearing Bolts.
3 Start the machine from the ground controls and
raise the primary and secondary booms to full
height. Do not extend the primary boom.
October 2014
Part No. 826364