Use of plywood cribbing to elevated. NOTE: If the machine does not have a lock-out switch, contact your Genie dealer to order provide a level surface for safe a switch installation kit.
Cribbing Instructions First Edition • First Printing Construction Specifications • Cribbing is to be constructed of APA certified • Ramps are to be constructed in a series of plywood sheets. steps. Each step shall be a minimum of 12 inches long. •...
First Edition • First Printing Cribbing Instructions Workplace Inspection Be aware of and avoid the following hazardous situations when using cribbing: • unstable surfaces that could shift under cribbing • surfaces that cannot support the cribbing (refer to the floor loading specifications in the operator's manual) Observe and Obey: •...
6 Operate the machine lift function according to 2 Make sure the Genie aerial lift has been the instructions in the appropriate operator's modified with a lock-out switch that disables the manual.
Need help?
Do you have a question about the Z-45/25 and is the answer not in the manual?
Questions and answers