Dply - C-COM Satellite iNetVu 7710 User Manual

Antenna controller
Table of Contents

Advertisement

C-COM Satellite Systems Inc.
4 – Axis Selection and looping option
The first two characters refer to the axis selection (i.e. DD: D).
DD
Disable Test for all axes
EL
Perform test on the Elevation axis only
AZ
Perform test on the Azimuth axis only
PL
Perform test on the Polarization axis only
AA
Perform tests on all the axes.
The third character refers to the looping intervals between tests (i.e. DD: D or DD: 1).
D
Disables looping, test will only be performed once.
1
Infinitely loops with NO_DELAY interval between tests.
2
Infinitely loops with 10-seconds interval between tests.
3
Infinitely loops with 30-seconds interval between tests.
6
Infinitely loops with 1min interval between tests.
9
Infinitely loops with 3min interval between tests.
5 – Test Selection
Initiates the test on the specified axes according to the specified ranges, and speeds. Press up or
down key, first letter will flash then press ENTER, the test routine will start.
7.11.2.

DPLY

1
3
1 – Elevation Movement
User-defined elevation angle of deploy
2 – Polarization Movement
User-defined polarization angle of deploy
3 – Azimuth Movement
User-defined azimuth angle of deploy
E: +20
P+60
A +180
DPLY
Fig. 45:
Deploy Configuration
iNetVu™ 7710 Controller User Manual
2
4
56

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for C-COM Satellite iNetVu 7710

This manual is also suitable for:

Inetvu 7720

Table of Contents