4.5 Add Racks to the Priority Rack Set Unit
Racks placed on the priority rack set unit are analyzed at a higher priority than
racks placed on the rack set unit.
If an error occurs and the rack cannot be processed, remove the rack by
opening the small door on the left side of the rack set unit.
WARNING
B00418AA
Add racks to the rack set unit when the green LED is on.
If the rack set unit orange LED is blinking, press the
button to stop moving existing racks. When the orange LED is off (the
Rack Set/Diag button is blinking), new racks can be loaded.
Press the
Rack Set/Diag
Be careful of the direction in which the rack is set.
When the priority rack set unit LED is flashing, additional
racks can not be processed from the priority rack set unit.
Wait until the LED stops flashing.
4.5 Add Racks to the Priority Rack Set Unit
button again to start racks moving.