Perform Daily Maintenance; Check Analyzer Status - Beckman Coulter AU5800 Quick Manual

Chemistry analyzer
Hide thumbs Also See for AU5800:
Table of Contents

Advertisement

Daily Start Up

3.2 Perform Daily Maintenance

3.2 Perform Daily Maintenance
Inspect and perform Daily Maintenance to ensure system performance and
safety.
Inspect the syringes for leaks
Inspect, clean and prime the sample probes, reagent probes, and mix bars
Inspect the printer (optional) and paper
Replace the deionized (DI) water in the pre-dilution bottles
Prepare the probe wash solution
Inspect the stability of the upper cover
For details on performing daily maintenance inspections, refer to 8.3 Daily
Maintenance in the AU5800 User's Guide, chapter 8.
CAUTION
To prevent injury or infection be sure to wear protective gloves and
other protective equipment when performing maintenance.
For additional protection, observe the WARNING and CAUTION
statements in the AU5800 User's Guide.

3.3 Check Analyzer Status

Check
Analyzer Status
the temperatures of the incubators and refrigerated R1/R2 compartments. The
rack set trays, rack collection trays, rack transport belts, wash solution tanks,
DI water tanks, waste tanks, printer, and LIS communication are monitored.
Color
Blue
Yellow or Orange
Red
When the ISE is installed, a diagram of the ISE unit is also displayed.
3-6
to display a color-coded overview of the system, and
No errors
Non-fatal error, the unit can be started
Fatal error, the unit cannot be started
Status
B00418AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents