Energy Metering; Demand Metering - GE T60 Instruction Manual

Transformer protection system ur series
Hide thumbs Also See for T60:
Table of Contents

Advertisement

6.3 METERING
The metered values for real, reactive, and apparent power, as well as power factor, are displayed in this menu. The "SRC
1" text will be replaced by whatever name was programmed by the user for the associated source (see

TEM SETUP
SIGNAL SOURCES
g) ENERGY METERING
PATH: ACTUAL VALUES
 ENERGY
 SRC 1
6
The metered values for real and reactive energy are displayed in this menu. The "SRC 1" text will be replaced by whatever
name was programmed by the user for the associated source (see
Because energy values are accumulated, these values should be recorded and then reset immediately prior to changing
CT or VT characteristics.
h) DEMAND METERING
PATH: ACTUAL VALUES
 DEMAND
 SRC 1
6-20
SRC 1
APPARENT PWR
MESSAGE
a:
0.000
SRC 1
APPARENT PWR
MESSAGE
b:
0.000
SRC 1
APPARENT PWR
MESSAGE
c:
0.000
SRC 1
POWER FACTOR
MESSAGE
3:
SRC 1
POWER FACTOR
MESSAGE
a:
SRC 1
POWER FACTOR
MESSAGE
b:
SRC 1
POWER FACTOR
MESSAGE
c:
).

METERING
SOURCE SRC 1
SRC 1
POS WATTHOUR:
0.000
SRC 1
NEG WATTHOUR:
MESSAGE
0.000
SRC 1
POS VARHOUR:
MESSAGE
0.000
SRC 1
NEG VARHOUR:
MESSAGE
0.000

METERING
SOURCE SRC 1
SRC 1
DMD IA:
0.000
SRC 1
DMD IA MAX:
MESSAGE
0.000
SRC 1
DMD IA DATE:
MESSAGE
2001/07/31 16:30:07
SRC 1
DMD IB:
MESSAGE
0.000
SRC 1
DMD IB MAX:
MESSAGE
0.000
T60 Transformer Protection System
VA
VA
VA
1.000
1.000
1.000
1.000

ENERGY
Wh
Wh
varh
varh

SETTINGS

DEMAND
A
A
A
A
6 ACTUAL VALUES
SETTINGS

SYSTEM SETUP
SIGNAL SOURCES
GE Multilin

SYS-
).

Advertisement

Table of Contents
loading

Table of Contents