Iec 255-8 Sample Operate And Reset Curves - GE T60 Instruction Manual

Transformer protection system ur series
Hide thumbs Also See for T60:
Table of Contents

Advertisement

5.7 CONTROL ELEMENTS
To ensure element accuracy for high overcurrent conditions, the maximum value of I/(k x I
istically it is exceeding this value.
The reset time of the thermal overload protection element is also time delayed using following formula:
5
In the above equation,
τ
= thermal protection trip time constant
rst
T
is a minimum reset time setting
min
The thermal overload protection element estimates accumulated thermal energy E using the following equations calculated
each power cycle. When current is greater than the pickup level, I
5-308
---------------------------- -
t
ln
=
rst
rst
Figure 5–157: IEC 255-8 SAMPLE OPERATE AND RESET CURVES
E
E
=
n
n 1
T60 Transformer Protection System
2
kI
B
T
+
min
2
2
I
kI
B
> k × I
, element starts increasing the thermal energy:
n
B
t 
-------------- -
+
t
op In
5 SETTINGS
) is limited to 8, even when real-
B
(EQ 5.51)
(EQ 5.52)