13. Connect the fuel supply and return hoses and secure
with the hose clamps.
14. Using new crush washers, connect the fuel inlet and
lift pump outlet banjo-fitting bolts to the lift pump
and tighten the banjo-fitting bolts securely.
102
15. Install the V-belt cooling fan assembly; then install
the V-belt cooling boots to the V-belt housing.
DE077C
16. Connect the V-belt cooling fan connector.
DE494A
17. Install the air filter assembly and secure with four
cap screws; then connect all hoses and secure with
hose clamps. Tighten all hardware securely.
DE065A
18. Install the coolant filler neck on the thermostat hous-
ing and tighten the hose clamp securely; then install
the upper radiator hose. Tighten all hose clamps
securely.
DE078B
DE076A
DE518A
DE682C