6. Fit the duct to original position.
Place the humidifying tray and set the humidifying
tray cover as shown in Fig. 5.
Humidifying tray cover
7. Replace the insulations into the UV lamp lead wire
hole with the wires passed through the cuts on both
insulations. See Fig. 6.
UV lamp
lead wire
Insulation
Fig. 6
Fig. 5
8. Remote the 2 caps shown in Fig. 7.
Fit Glow Ass'y ( ) and Ballast ( )
by using 4 screws ( ).
Cap
Glow Ass'y
- 82 -
Ballast
Screw (4pcs)
Fig. 7