Nortel CVX 600 Hardware Installation Manual page 29

Multi-service access switch
Table of Contents

Advertisement

Reference
For PTE 2000 rack installation instructions, see the PTE 2000 Installation Guide
(IM 07-08-1543).
Anchor Kits
Nortel Networks offers four types of PTE 2000 anchor kits; each kit contains two
anchors. If you do not plan to order anchor kits from Nortel Networks, you can
use other anchor kits that provide the same level of seismic protection.
The following table describes each of the anchor kits.
Kit Number
NTRU0324
NTRU0328
NTRU0323
NTRU0326
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
Note: You must use six floor anchors to secure the PTE 2000 rack to the
equipment-room floor.
Earthquake Zone
Compliance
Up to and including zone 4 Raised or concrete
Up to and including zone 4 Concrete floor only
Up to and including zone 2 Raised or concrete
Up to and including zone 2 Concrete floor only
Mounting the CVX 600 in a Rack
Floor Type
Notes
Includes M12
floor
anchoring hardware
(2 anchors)
Includes M12
anchoring hardware
(2 anchors)
Includes 3/8 in.
floor
anchoring hardware
(2 anchors)
Includes 3/8 in.
anchoring hardware
(2 anchors)
Chassis Installation
1-9

Advertisement

Table of Contents
loading

Table of Contents