Telco and EIA Rack Hole Spacing

You can use mounting flanges to install the CVX 600 chassis in a Telco or EIA
rack. Telco and EIA racks have 0.5-inch spacing between the dual mounting
holes, and 0.625-inch spacing between the dual mounting hole pairs.
The following figure shows the positions on the mounting flange that you use for
Telco and EIA racks.
1
2
3
4
5
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
DC chassis option
EIA: Use positions 2 and 4
TELCO: Use positions 1, 3, 5
Note: Before you install the CVX 600 chassis in a rack, determine the
type of rack you have so that you can properly align the mounting holes.
Chassis Installation
Installing the CVX 600 Chassis
AC chassis option
1
2
3
4
5
6
7
EIA: Use positions 1, 3, 5, 7
TELCO: Use positions 2, 4, 6
CVX-0222A
1-21