Nortel CVX 600 Hardware Installation Manual page 117

Multi-service access switch
Table of Contents

Advertisement

Installing an SCC-LTM or SCC-RLTM
To install an SCC-LTM or SCC-RLTM, follow these steps:
Step
1
2
3
4
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
Action
Make sure the power switches on the PDUs are both off.
Holding the SCC-LTM/RLTM, use the guides to align the sides of the module
with either slot 5 or slot 6.
Grasp the top and bottom ejector levers and push them outward, then push
the SCC-LTM/RLTM into the chassis until its connector touches the connector
on the SCC-SM.
Push the levers inward to fully engage the locking mechanism.
4
S y s t
5
e m
C o n
t r o l l e
r
o n ly
6
3
4
S y s te
5
m
C o n
tr o ll e
r
o n ly
6
Replacing CVX 600 Components
Replacing Modules and Filler Panels
C o n
s o le
1
2
M a in
C h a
s s is
3
4
CVX-0156C
(continued)
3-19

Advertisement

Table of Contents
loading

Table of Contents