Nortel CVX 600 Hardware Installation Manual page 164

Multi-service access switch
Table of Contents

Advertisement

connecting the CVX 600 to
F
fan module
1-3
fan module, replacing
3-31
filler panels, installing and removing
flash memory cards, installing and removing
G
,
grounding location
2-17
2-18
grounding the chassis for DC power
using the compression terminal
using the NEBS-compliant dual-connector
posts
2-18
H
HSSI interface
connecting to
2-12
specifications
A-9
I
installation
1-23
in a rack
1-20
mounting hardware
1-17
on a flat surface
1-18
service console
1-16
tools and equipment for
unpacking the shipment
interfaces, connecting to
10/100BASE-T
2-8
,
DS1
2-9
2-10
DS3
2-11
E1
2-10
HSSI
2-12
L
light-emitting diodes (LEDs), checking
line termination modules (LTMs), replacing
Index-2
2-26
3-4
2-29
,
2-19
2-19
1-16
1-14
2-43
3-27
M
management console cable specifications
modem
connecting to the CVX 600
parameters
2-37
mounting options
1-7
N
network cables, connecting to interfaces
O
Optical DAC
2-51
optical interface
2-13
Optical SCC-II
2-48
P
PC, connecting to the CVX 600
,
,
,
PDU
1-3
2-16
2-25
2-42
pin assignments
alarm interface connector
Ethernet 10/100BASE-TX interface cable
Ethernet interface cable
HSSI DTE to DCE interface cable
power
connecting to an AC power source
connecting to the CVX 600
grounding the chassis for DC power
power cable
connecting to a DC power source
PTE 2000 rack
1-8
R
rack cooling requirements
rack mounting the CVX 600
in a Telco rack
1-21
in an EIA rack
1-21
locating the mounting holes
radio frequency specifications
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
A-7
2-37
2-7
2-35
A-16
A-11
A-11
A-9
2-25
2-16
2-17
2-22
1-11
1-20
1-23
A-5

Advertisement

Table of Contents
loading

Table of Contents