Tadiran Telecom Emerald ICE Quick Installation Manual page 45

Digital key telephone system
Hide thumbs Also See for Emerald ICE:
Table of Contents

Advertisement

Emerald ICE Quick Installation Guide
17. Observe the System Status LED on each KSU next to the power switch. This LED fol-
lows LED DA2 on the CCB (Central Control Board) and indicates the status of the
main system processor. During the first power-up sequence (Cold-Start strap moved
to "Normal" position), default data (factory program) is loaded. A series of flash rates
occur during this process. When default is successfully loaded or whenever the sys-
tem becomes functional following a power failure, the CCB Heart-beat LED and Sys-
tem Status LED maintains a consistent fast flash rate.
Page 3-3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Emerald ICE and is the answer not in the manual?

Questions and answers

Table of Contents