Handling

Once having removed the packaging, the POWER
PLUS Boiler is handled manually by tilting and lifting it,
grabbing the points shown in the figure.
b
Do not grab the casing of the boiler, but rather
the "solid" parts such as the boiler bed and the
rear structure.
b
Adopt suitable safety and protection measures.
a
The packaging material must not be dispersed in
the environment or left within the reach of children
as it is a potential source of hazard. It must be
disposed of according to the legislation in force.

Room where the Boiler is Installed

26
The POWER PLUS boiler must be installed in a dedicated boiler room, with adequately sized vents, in compliance with
applicable laws and standards.
If comburent air is drawn from outside the boiler room (using accessories code 1102439 and 1102449), the Powerplus boiler
functions as a sealed (type C) appliance.
b
Provide enough clearance to access the safety and
control devices and to carry out the servicing ope-
rations.
b
Check that the index of protection of the boiler is
suitable for the characteristics of the room where
the appliance is installed.
b
If the boilers operate on gas fuel with a higher spe-
cific weight than air, the electrical parts must be
located at least 500 mm from the floor.
a
The boilers cannot be installed outside as they
are not designed for outdoor operation.