Installing The Boiler; Water Connections - Beretta POWER PLUS Installation Instruction

Wall-hung condensing boiler
Hide thumbs Also See for POWER PLUS:
Table of Contents

Advertisement

Installing the Boiler

The POWER PLUS Boiler must be secured to a solid
brick wall using the bracket (1).
For installation:
- Position the bracket (1) on the wall at a height of
around 200 cm from the ground, using a spirit level to
make sure that the holes are perfectly horizontal
- Mark the fastening holes on the wall
- Drill the holes and insert the expansion plugs (2)
- Fasten the bracket to the wall using the screws (3)
- Hook the boiler to the bracket.
b
The height of the boiler should chosen so as to sim-
plify the dismantling and servicing operations.
b
The POWER PLUS Boiler is not designed for
outdoor installation.

Water Connections

28
The POWER PLUS Boilers are designed and built to
be installed in central heating and domestic hot water
systems. The characteristics of the water fittings are as
follows:
MI
- Central heating flow outlet 1" M
RI
- Central heating return inlet 1" M
Gas - Gas supply 3/4" M
CONDENSATE COLLECTION
Identify the condensate drain (S) located at the bottom of
the boiler and then:
- remove the ring nut/nuts (1)
- pass the hose (2) through the hole and replace the ring
nut on the outside.
Pipe the condensate into the sewerage drain or a neu-
traliser, where required and in-accordance with any
legislation in force.
b
The manufacturer is not liable for any damage cau-
sed by the failure to install the condensate drain
pipe.
b
The condensate drain pipe must be watertight.
1
3
1
2
S
MI RI
GAS
59
149
239
334
424
2
MI RI
GAS
514

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents