2.8
Overall dimensions and weights
Description
L
P
P1
H
14
Net weight of boiler
2.9
Handling
b
Use equipment adequate for the weight
involved to move the boiler to the place
of installation.
b
Make sure that the boiler does not strike
rigid surfaces like floors or walls when it
is being moved.
- Remove the straps securing the cast iron
boiler body to its pallet.
- Pass lifting slings through the cast iron
body. Lift carefully and position at the place
of installation.
b
Wear suitable personal protective equip-
ment and use suitable safety devices.
b
The boiler is supplied without a base.
Place a suitable sheet of metal under
the boiler to protect the floor surface.
H
129
151
810
920
1110
1110
880
880
1365
1365
542
612
172
194
215
1030
1145
1255
1110
1140
1140
880
880
880
1365
1365
1365
682
757
829
237
258
279
1370
1480
1580
1190
1190
1190
880
880
880
1365
1365
1365
904
974
1044
Fig. 2.8
mm
mm
mm
mm
kg
Fig. 2.9