Installer; Unpacking The Product; Handling - Beretta IDRA MS Series Installation Manual & Users Manual

Solar storage cylinder
Table of Contents

Advertisement

10 UnPacking tHe ProdUct

storage cylinders are delivered in a single
IDRA MS
B
package, protected by a cardboard box on a wooden pal-
let.
The following items are delivered in a plastic bag inside the
packaging:
- Instruction manual
- Spare parts catalogue
- Hydraulic test certificate
H
A
MODEL
A
200
700
300
700
430
850
550
850

11 Handling

Make sure that any lifting equipment is of adequate ca-
pacity to lift and move the storage cylinder. Remove the
brackets (1) to free the storage cylinder.
To lift the storage cylinder, remove the plug (2) and insula-
tion (3) and screw an eyebolt (Ø 10 mm) of suitable capa-
city for the weight of the cylinder into the hole (4).
1
1
B
Weight
B
H
(Kg)
700
1480
85
700
1980
115
850
1790
150
850
2130
165
2
3
4
1
If suitable equipment is not on hand to lift the storage cylin-
der off the pallet using the eyebolt, proceed as follows.
- Place a platform of about half the height of the pallet near
the storage cylinder. Make sure the platform is able to
support the weight of the storage cylinder.
- Remove the brackets (1) then carefully rotate and slide
the storage cylinder off the pallet on to the platform.
- Make sure that the storage cylinder is perfectly stable,
and then remove the pallet.
- Carefully rotate and slide the storage cylinder off the pla-
tform on to the floor.
- Remove the platform. Position the storage cylinder as
required.
Adjust the feet to ensure that the storage cylinder is per-
fectly level.
b
Wear suitable personal protective equipment and use
suitable safety devices.
a
Do not dispose of packaging material into the envi-
ronment, or leave it within the reach of children, since
it can become a potential hazard. Dispose of packa-
ging material in compliance with applicable legisla-
tion.

Installer

11
17

Advertisement

Table of Contents
loading

Table of Contents