Handling - Beretta NOVELLA 55 RAI Installation Manual

Cast iron base
Table of Contents

Advertisement

C
B
A
C
E
D
F
G
2.8

Handling

Once you have removed the packaging, pro-
ceed as follows to handle the boiler:
- Remove the screws securing the boiler to
the wooden pallet.
- Remove the front panel (P) and top panel
(C) from the casing (fig. 2.5).
P
- Unscrew the nut (A) from the top front tie-
rod (fig. 2.6).
- Fit one of the lifting plates (B) over the end
of the tie-rod (C) (fig. 2.6).
Fig. 2.5
- Screw the nut (A) back on (fig. 2.6).
- Unscrew the nut (D) from the top rear tie-rod
(fig. 2.7).
- Fit the second lifting plate (E) over the end
of the tie-rod (F). Make sure that the second
lifting plate is diagonally opposite that fitted
previously (fig. 2.7).
- Screw the nut (D) back on (fig. 2.7).
- Lift the boiler using a 1" pipe (G) inserted
through the two lifting plates (fig. 2.8).
- Once the boiler is in its final installation posi-
tion, reverse the above steps to remove the
two lifting plates. Securely tighten the nuts.
b
Wear suitable personal protective
Fig. 2.6
equipment and use suitable safety devi-
ces.
a
Do not leave items of packaging within
the reach of children.
Fig. 2.7
Fig. 2.8
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Novella 64 raiNovella 71 raiNovella 55-64-71 rai

Table of Contents