Beretta POWER PLUS Installation Instruction page 15

Wall-hung condensing boiler
Hide thumbs Also See for POWER PLUS:
Table of Contents

Advertisement

b
The pumps should be connected by installing suitable contactors with manual emergency operation.
to main earth pole
EA/ER
J7
J8
1
3
T1
J12
SLAVE 1
PC J5
T3
J10
1
J17
Main
PB
- DHW pump
PZ1
- Pump in zone 1
(high temperature)
PZ2
- Pump in zone 2
(low temperature)
VM
- Mixing valve
CR
- Remote control (accessory)
IA
- Analogue input
SB
- DHW probe
SZ1
- Probe in zone 1
SZ2
- Probe in zone 2 (low temperature)
SE
- Outside probe
TA1
- Room thermostat in zone 1
(high temperature)
TA2
- Room thermostat in zone 2
(low temperature)
SYSTEM
gv
Earth
J6
gv
Earth
J14
Fuse 4A
gv
Earth
J15
Line
m
F1
a
Neutral
m
C
a
J2
v
m
Gas valve
g
a
b
Safety thermostat
m
m
J1
a
Diff. pressure switch
m
n
a
J11
Blower (+)
Hall sensor imput
Hall sensor power
Hall sensor common
Blower (-)
m
Outlet NTC
a
m
Return NTC
2
J9
J4
a
m
Flue gas NTC
a
BUS 1
IG1
to main earth pole
EA/ER
T1
VG
TS
PD
SLAVE 2
m
b
v
g
n
SM
SR
SF
VG
- Gas valve
TS
- Safety thermostat
PD
- Water differential pressure switch
SM
- Outlet probe
SR
- Return probe
SF
- Flue gas probe
EA/ER - Ignition/detection electrode
C
- Cable for connection to two-way valve
or injection pump (accessories)
IG
- Main boiler switch
IG1
- FIRST heating unit switch
IG2
- SECOND heating unit switch
J10/J17 - Microswitches for setting the address
(see page 54)
HEATING UNIT
parte 2
Earth
gv
J6
Line
m
a
Neutral
J2
1
2
J9
BUS 2
IG2
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents