Beretta POWER PLUS Installation Instruction page 17

Wall-hung condensing boiler
Hide thumbs Also See for POWER PLUS:
Table of Contents

Advertisement

VG
- Gas valve
TS
- Safety thermostat
PD
- Water differential pressure switch
SM
- Outlet probe
SR
- Return probe
SF
- Flue gas probe
EA/ER - Ignition/detection electrode
C
- Cable for connection to two-way valve or injection pump (accessories)
IG
- Main boiler switch
IG1
- FIRST heating unit switch
IG2
- SECOND heating unit switch
J10/J17 - Microswitches for setting the address (see page 54)
to main earth pole
gv
T1
SLAVE 2
PC
J5
T3
J10
J17
Main
L = 1200 mm
EA/ER
J6
J14
Fuse 4A
J7
J8
J15
1
3
F1
J2
v
g
b
J12
m
J1
n
J11
1
2
J9
J4
BUS 1
gv
Earth
Earth
gv
Earth
gv
Line
m
a
Neutral
m
C
a
m
Gas Valve
a
Safety thermostat
m
a
Diff. pressure switch
m
a
Blower (+)
m
Hall sensor imput
b
Hall sensor power
v
Hall sensor common
g
Blower (-)
n
m
Outlet NTC
a
m
Return NTC
a
m
Flue gas NTC
a
Bus line with female
connector for connection
to another model 100 S
or 100 S DEP boiler.
part 2
IG2
VG
TS
PD
SM
SR
SF
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents