Plumbing System; Receiving The Product; Handling - Beretta BV 120 Installer Manual

Hide thumbs Also See for BV 120:
Table of Contents

Advertisement

Available languages

Available languages

Plumbing system

MS
RS
EAF
UAC
RL
CI
AV
SC

Receiving the product

BV 120 and BV 160 boilers are supplied in a single pack,
protected by a plastic bag and suitable packing, strapped to a
wooden pallet.
The following material is supplied in a plastic envelope inside the
packaging.
- Instruction manual.
- Rubber gland connection
- Safety valve drain pipe

Handling

The product must be handled using equipment that is suitable for
its weight.
Cut the straps, pull out the packaging and plastic bag, separate
the boiler from the pallet, being careful to position it so that it is
stable and to provide easy access to the parts on which
maintenance work will have to be done.
UAC
EAF
RS
RL
MS
BV 120
CI
SC
Pipe coil feed
Pipe coil return
Cold water intake
Hot water outlet
Water circulation
System filling
Expansion vessel
connection
Drain tap
13
AV
BV 160

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bv 160

Table of Contents