Quantum Scalar i500 User Manual page 145

Tape library
Hide thumbs Also See for Scalar i500:
Table of Contents

Advertisement

1
parking tab in "unpark" position
2
Close the library's I/E station and access doors.
3
Add the tape drives to the modules. For details, see
page 193.
4
If your library contains FC I/O blades, install both the I/O blades and the accompanying fan blades in
the expansion module. For details, see
and
Adding, Removing, and Replacing the I/O Fan Blade
5
Add the power supplies. For details, see
page 179.
6
Connect all power cords, network data cables, and module-to-module cables. Make sure the module
terminators are installed at the top and bottom of the stack of modules. For cabling instructions, see
Cabling the Library
7
Power on the library. For libraries larger than a 14U, boot time may take 15-20 minutes.
Scalar i500 User's Guide
Adding, Removing, and Replacing FC I/O Blades
Adding, Removing, and Replacing Power Supplies
on page 102.
1
Adding, Removing, and Replacing Tape Drives
on page 201.
on
on page 196
on
133