Installation; Step 1: Unpacking And Checking The Contents Of The Package - FP postbase Operator's Manual

Hide thumbs Also See for postbase:
Table of Contents

Advertisement

3

Installation

Step 1:
Unpacking and checking the contents of the package
Warning! Do not start operating PostBase if parts are damaged or missing.
Please contact the Customer Support.
Caution! Carry out the steps exactly in the given order. Also, consult the
installation instructions (fold-out).
• Unpack the packages.
• Check that the contents of the packages
are complete and free from any damage.
Keep the packing. Use it again when you
need to transport PostBase or send it in to
the Customer Support.
Scope of delivery
– PostBase franking machine
– Hand feed tray (not all product variants)
– Catch tray with stop
– Weighing platform (version as ordered)
– Power cable
– USB cable
– Ethernet cable
– Ink cartridge set
– Franking labels
– 'First steps' manual
– Installation instructions (flyer).
Optional, only when ordered separately
– Sealer
– External USB modem incl. modem cable
(not available in all countries)
– Feeder incl. slope, pendulum, power cable,
termination plug, replacement sponge
holder with sponge
– 'sealit' sealing liquid.
15
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents