Sections; Creating A New Section - iPEK VISIONCONTROL VC200 User Manual

Table of Contents

Advertisement

Sections

Sections
The term section refers to the part of a sewer inspection between two manholes. During a project you can collect data for multiple sections that
you can analyze individually later. In the Section Overview the existing sections of a project are listed; new sections can be added and existing
sections can be deleted. Directly after creating a new general project you are always prompted to create a new section. If this is not done, you
can create a new section, or select an existing section at any time during the inspection. The video recording will pause during this time. In simple
projects you cannot create any sections.

Creating a new section

• Select New section.
FACILITATED WORKSTEP!
If you have selected a section, then at this point the system will ask whether you want to use the values of the current section as a
template for the new section. This saves you time when making the entry.
• Confirm the system dialog with YES or NO.
• Enter the values for the new section in the section fields.
NOTE!
Input fields which are displayed in bold font in the section overview are mandatory. Without any input in these fields, the section is
not valid and you cannot continue.
• Confirm the entry by clicking on the continue button.
After you have confirmed the dialog with Continue, the view changes directly to the inspection view. You can start or continue your inspection.
For information on recording inspection data, such as video data, screenshot data, or event data, read the chapter "Execution of the inspection"
starting on Seite 75.
User interface
63

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VISIONCONTROL VC200 and is the answer not in the manual?

Table of Contents

Save PDF