Input/Output Box Bracket System - MGE UPS Systems EX-11RT Installation And User Manual

Mge installation and user manual ups ex 5/7/11rt
Hide thumbs Also See for EX-11RT:
Table of Contents

Advertisement

EX 5/7/11RT Systems
NOTE:
The I/O Box bracket system keeps the I/O Box stationary while hot swapping the Power Module. It will then be
easier to slide the replacement module into the connectors of the I/O Box.
1&2. Secure small brackets to larger bracket from the underside
3.
Secure small attached brackets to the I/O Box with four screws.
4.
Secure large bracket
Figure 2-7: Input/Output Box Bracket System.
1
2 — 8
This step is unique to the Power Module. It involves the installation of the I/O Box
Bracket System.
27
to rails at the rear of module with four nuts.
2
4
Installation
27
.
3
OFF
4
Install input/output cables
per section 2.7 prior to this step.
86-86000-00 B00

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EX-11RT and is the answer not in the manual?

This manual is also suitable for:

Ex-5, ex-7, ex-11rtEx-7Ex 5rtEx 7rtEx 11rt

Table of Contents

Save PDF