Panasonic FP0R User Manual page 59

Programmable controllers
Hide thumbs Also See for FP0R:
Table of Contents

Advertisement

Measures regarding heat discharge
Installation space
FP0R User's Manual
Always install the CPU orientated with the TOOL port facing outward on
the bottom in order to prevent the generation of heat.
Do NOT install the CPU as shown below.
Q Upside-down
W Upside-down
E Input and output connectors face down
R Input and output connectors on top
T Horizontal installation of the unit
Do not install the unit above devices which generate heat such as heat-
ers, transformers or large-scale resistors.
Leave at least 50mm of space between the wiring ducts of the unit and
other devices to allow heat radiation and unit replacement.
Installation and wiring
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents