Kyocera KM-C2525E Service Manual page 268

Hide thumbs Also See for KM-C2525E:
Table of Contents

Advertisement

2JL/2JJ/2JG/2JD
9. Remove the paper feed/developing motor
BK and feed PWB from the conveying drive
unit.
10. Replace the conveying drive unit and refit
the paper feed/developing motor BK and
feed PWB.
11. Install the conveying drive unit.
12. Refit the rear cooling fan motor.
13. Refit left lower cover2, left cover 2, rear
cover and cassette 1/2.
(3) Detaching and refitting the registration clutch
Follow the procedure below to replace the registration clutch.
Procedure
1. Remove the conveying drive unit (see page
1-5-35).
2. Remove the stop ring and connector and
then remove the registration clutch.
3. Replace the registration clutch and install
the clutch.
4. Refit the conveying drive unit.
1-5-36
Conveying
drive unit
Stop ring
Paper feed/developing
motor BK
Feed PWB
Figure 1-5-79
Connector
Registration clutch
Figure 1-5-80

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Km-c3232eKm-c4035eKm-c3225e

Table of Contents