To install a BCM50 unit on top of another unit

1
Insert the power supply retention clip into the BCM50 unit.
2
Place the BCM50 unit on top of the other unit. Make sure the feet of the unit are in the slots on
the top of the unit and in front of the slots. See the figure
85.
3
Slide the unit back until it clicks in place on the slots.
4
Install the power supply using a method appropriate for your installation. For details about
installation options, see
Figure 37 BCM50 unit slots and feet

Installing the patch panel (optional)

Install the optional patch panel in the equipment rack.

To install the patch panel

1
Determine the location in the rack where you want to install the patch panel.
2
Position the patch panel in the rack.
3
Align the holes in the patch panel with the holes in the equipment rack rails.
4
Fasten the patch panel to the rack using the four rack screws (supplied with the patch panel).
5
Continue with the procedure
Installing the BCM50 power supply
Slots
Feet
To connect the cables to the patch panel (optional)
Chapter 7 Installing the main unit
BCM50 unit slots and feet
on page 92.
Installation and Maintenance Guide
85
on page
on page
117.