Vs Sensor Inspection; Vs Sensor Replacement - Honda VT750C2 Shadow Spirit Service Manual

2007-2009 motorcycle
Hide thumbs Also See for VT750C2 Shadow Spirit:
Table of Contents

Advertisement

LIGHTS/METERS/SWITCHES
Connect the speedometer 12P connector and install
12P CONNECTOR
the dust cover.
Install the speedometer assembly on the fuel tank,
aligning the fuel tank tab with the meter slot.
Install and tighten the bolts to the specified torque.
TORQUE: 10 N·m (1.0 kgf'm, 7 Ibf·ft)
VS SENSOR INSPECTION
Remove the seat (page 3-3).
Disconnect the VS sensor 3P (Natural) connector.
Turn the ignition switch to ON and measure the
voltage at 3P (Natural) connector of the wire har­
ness side.
CONNECTION: Brown
(+) -
Green/Black (-)
STANDARD:
Battery Yoltage
There should be battery voltage.
If there is no voltage, check for an open circuit in the
Brown and Green/black wires.
Support the motorcycle securely and raise the rear
wheel off the ground.
Connect the test harness between the VS sensor 3P
(Natural) connector.
TOOL:
Inspection test harness
07GMJ-MLB0100
Measure the voltage between the Red clip
(+)
and
White clip (-).
CONNECTION: Red clip
(+) -
White clip (-)
STANDARD:
Repeat 0 to 5 V
Shift the transmission into neutral and turn the igni­
tion switch to ON.
Slowly turn the rear wheel by hand.
If pulse voltage does not appear, replace the VS sen­
sor.
VS SENSOR REPLACEMENT
Remove the following:
-
Seat (page 3-3)
-
Left side cover (page 3-3) .
-
Left crankcase rear cover (page 3-5)
Disconnect the VS sensor 3P (Natural) connector.
21-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents