Basic Information; Installing Processors; Required Tools - Fujitsu PRIMERGY BX924 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX924 S3:
Table of Contents

Advertisement

Processors
9.1

Basic information

The system board D3143 offers two sockets for Intel Xeon processors.
Supported processors
– CPU: Intel Xeon processor E5-2600 family
– Socket type: LGA 2011 package
– Thermal Design Power (TDP) class: up to 135 W
9.2

Installing processors

Field Replaceable Units (FRU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes
V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
9.2.1

Required tools

Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
Installing the processor: tool-less
182
Upgrade and Maintenance Manual
BX924 S3

Advertisement

Table of Contents
loading

Table of Contents