Replacing Steps - Fujitsu PRIMERGY BX924 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX924 S3:
Table of Contents

Advertisement

4.4.2

Replacing steps

Ê Open both server blades, see section
page
60.
Ê Remove the heat sinks from and the processors from the defective server
blade and install it into the new server blade, see section
processor heat sinks" on page 218
see section
"Upgrading or replacing processors" on page
Ê Remove the mezzanine card carrier with the installed mezzanine card(s)
from the defective server blade, see section
on page
152.
Ê Remove the memory modules from the defective server blade and install it
into the new server blade, see section
page
175.
Ê If an UFM is installed, remove it from the defective server blade and install it
into the new server blade, see section
page
239.
Ê If an TPM is installed, remove it from the defective server blade and install it
into the new server blade, see section
page
251.
Ê If an SCU key is installed, remove it from the defective server blade and
install it into the new server blade, see section
Upgrade ROM (SCU key)" on page
Ê Install the mezzanine card carrier into the new server blade, see section
"Replacing mezzanine cards" on page
Ê Use the cover from the defective server blade and close the server blade,
see section
"Closing the server blade" on page
Use the cover from the defective server blade because the COA label is
stuck there.
I
It is necessary to complete ID card with the model name and the serial
number. Please use the new label.
BX924 S3
and install it into the new server blade,
Upgrade and Maintenance Manual
Basic hardware procedures
"Opening the server blade" on
"Replacing mezzanine cards"
"Replacing memory modules" on
"USB Flash Module (UFM)" on
"Trusted Platform Module (TPM)" on
"Onboard Controller SAS
266.
152.
61.
"Handling
207.
57