Concluding steps

Perform the following procedures to complete the task:
Ê If applicable, install the air cowls as described in section
cowls" on page
Ê If applicable, reinstall the mezzanine carrier as described in section
"Installing mezzanine cards" on page
Ê Close the server blade as described in section
page
61.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê If applicable, close the rack door as described in section
door" on page
Ê If available, update the system board BIOS to the latest version as described
in section
"Updating or recovering the system board BIOS and iRMC" on
page
80.
Ê Enable boot watchdog functionality as described in section
watchdog functionality" on page
Ê Enable the replaced memory module(s) as described in section
replaced components in the system BIOS" on page
Ê Verify if the memory mode has been restored to its original state as
described in section
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
BX924 S3
178.
67.
"Verifying the memory mode" on page
Upgrade and Maintenance Manual
142.
"Closing the server blade" on
92.
99.
Main memory
"Installing the air
62.
"Closing the rack
"Enabling boot
"Enabling
93.
93.
"Enabling
177

Advertisement

Table of Contents
loading

Table of Contents