Concluding Steps - Fujitsu PRIMERGY BX924 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX924 S3:
Table of Contents

Advertisement

Figure 114: Mounting the TPM
Ê Connect the new TPM to the system board.
Ê Secure the TPM with the TPM screw (see arrow) using the TPM bit insert
(see
figure 113 on page
I
Do not fasten the screw too firmly. Stop as soon as the head of the
screw lightly touches the TPM.

10.3.1.4 Concluding steps

Perform the following procedures to complete the task:
Ê Close the server blade as described in section
page
61.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê If applicable, close the rack door as described in section
door" on page
Ê Enable TPM in the system board BIOS. Proceed as follows:
Ê Open a virtual console for your server blade as described in section
"Launching a video redirection to a server blade" on page
BX924 S3
254).
67.
Upgrade and Maintenance Manual
System board components
"Closing the server blade" on
62.
"Closing the rack
69.
255

Advertisement

Table of Contents
loading

Table of Contents