Concluding Steps - Fujitsu PRIMERGY BX924 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX924 S3:
Table of Contents

Advertisement

System board components

10.1.5 Concluding steps

Perform the following procedures to complete the task:
Ê Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
Ê Close the server blade as described in section
page
61.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê Verify and update time settings as described in section
time settings" on page
Ê If applicable, close the rack door as described in section
door" on page
238
94.
67.
Upgrade and Maintenance Manual
"Closing the server blade" on
62.
"Verifying the system
"Closing the rack
BX924 S3

Advertisement

Table of Contents
loading

Table of Contents