Concluding Steps - Fujitsu PRIMERGY BX924 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX924 S3:
Table of Contents

Advertisement

Figure 122: Installing the system board (B)
Ê Secure the system board with the screw (M3 x 6 mm, C26192-Y10-C68)
(see circle).
I
Screw torque: 0.6 Nm (not applicable for the Japanese market)
Ê Verify the settings on the new system board (jumpers and/or switch).
I
For a detailed description, please refer to section
on page

10.5.5 Concluding steps

Ê If applicable, reinstall the air cowls as described in section
cowls" on page
Ê Reinstall all remaining system board components as shown in the related
sections:
– Mezzanine cards with carrier: refer to section
cards" on page 142
I
Install all expansion cards into their original slots.
– TPM (if applicable): refer to section
page 251
BX924 S3
283.
178.
Upgrade and Maintenance Manual
System board components
"Onboard settings"
"Installing mezzanine
section "Installing the TPM" on
"Installing the air
275

Advertisement

Table of Contents
loading

Table of Contents