Installing An Eps-600Ls Power Supply - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

c Repeat steps
a
and
4 Slide the EPS-C into a 19-inch rack and secure it using appropriate rack-mount screws.
5 Connect the keyed end of the redundant power cord to the EPS-C (see
side of the connector marked TOP is facing up.
The key is a plastic tab on the cable connector housing that fits into the EPS-C to ensure correct
alignment of the connector.
6 Connect the other end of the redundant power cord to the Summit X450e-48p or X250e-48p switch
(see
Figure
163). Be sure that the side of the connector marked TOP is facing up.
Figure 163: Installing the Redundant Power Cord
Connect First
Redundant Power Output
! See Manual

Installing an EPS-600LS Power Supply

To install an EPS-600LS unit into an EPS-C:
1 If necessary, remove a cover plate from a slot in the EPS-C.
2 Slide the EPS-600LS into an empty slot in the EPS-C (see
CAUTION
Be sure that empty slots in the EPS-C chassis are always covered by a cover plate when not in use. The EPS-C is
shipped with slots 2 and 3 covered and slot 1 open. Extreme Networks recommends that you populate slot 1
with an EPS-600LS unit first, but this is not required. You can install EPS-600LS units into any of the slots in
the EPS-C. The installation sequence does not affect the performance of the power supply units, but empty slots
must be covered at all times.
Summit Family Switches Hardware Installation Guide
b
for the other side of the EPS-C.
Figure
163). Verify that the
EPS-C_03A
Figure
164).
191