Rack-Mounting The Eps-T; Installing An Eps-160 Power Supply Into An Eps-T - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Rack-Mounting the EPS-T

CAUTION
Do not use the rack-mount brackets to suspend the EPS-T from under a table or desk, or to attach the EPS-T to a
wall.
To rack mount the EPS-T:
1 Place the EPS-T upright on a stable surface, with the front facing you.
2 Remove the mounting bracket kit from the packaging.
3 Attach the mounting brackets as follows:
a Place a mounting bracket over the mounting holes on one side of the EPS-T (see
b Insert the screws and fully tighten them using a screwdriver.
Figure 147: Attaching the Mounting Bracket
c Repeat steps
a
and
4 Slide the EPS-T into a 19-inch rack and secure it using appropriate rack-mount screws.

Installing an EPS-160 Power Supply into an EPS-T

To install an EPS-160 power supply into the EPS-T:
1 Remove the EPS-160 power supply from the packing material.
2 Remove the cover plate from an empty slot on the EPS-T.
3 Insert the power supply into the empty slot on the EPS-T.
4 Tighten the captive thumbscrews to secure the power supply to the EPS-T.
5 Connect the EPS-160 power supply to the Summit switch, following the instructions in the next
section,
"Connecting the EPS-160 Power Supply to the
Summit Family Switches Hardware Installation Guide
ES4K026
b
for the other side of the EPS-T.
Switch."
Figure
147).
175

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents