Installing A Summit X480 Dc Power Supply - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Installing Summit Family Switches
Figure 109: Installing a PSU
5 To install an additional PSU, repeat steps 2 through 4.
NOTE
If PSUs are not installed in both power supply bays, be sure to install a cover over the unoccupied bay.
Unoccupied bays must always be covered to maintain proper system ventilation and EMI levels.
6 Connect the AC power cord to the input connector on the PSU. Then connect the cord to an AC
power outlet.
WARNING!
Always be sure that the source outlet is properly grounded before plugging the AC power cord into the AC PSU.

Installing a Summit X480 DC Power Supply

To install the Summit X480 DC PSU, perform the following tasks in the order listed:
1 Prepare the power cables and ground cable by attaching the provided connection lugs to the cables
(see next section).
2 Insert the PSU into the Summit X480 series switch (see
3 Connect the ground (see
4 Have a qualified licensed electrician connect the PSU to the DC source voltage (see
5 Energize the DC circuit.
WARNING!
To prevent an electrical hazard, make sure that the DC power cord is not connected to the PSU before you install
the PSU in the power supply bay.
136
page
139).
SH_138
page
138).
Summit Family Switches Hardware Installation Guide
page
141).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents