Extreme Networks Summit X150 Series Hardware Installation Manual page 212

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Maintenance Procedures for Summit X650 and Summit X480 Series Switches
5 Install the replacement VIM in the switch
a Make sure the inserter/ejector levers are rotated down.
b Carefully slide the module into the switch until the inserter/ejector levers begin to rotate upward.
c Simultaneously rotate both levers upward to seat the module internal connectors.
d Insert and tighten the retaining screws you removed earlier.
Figure 181: Installing a VIM1 Module (VIM1-SummitStack Module Shown)
212
(Figure
181):
SH_093
Summit Family Switches Hardware Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents