Install Your Switch
Mounting the ISW (Two-Post Rack)
This procedure uses the two-post mounting kit. The ISW 24GbP, 4-SFP switch can
be installed in a standard two-post equipment rack. It does not support Din-rail or
wall-mount options.
Take care to load the rack so that it is not top-heavy. Start installing equipment at the
bottom and work up.
1. Attach a rack ear to one side of the switch, screwing it into the holes so that the
flange (ear) is flush with the front of the switch.
2. Attach the other rack ear to the other side.
3. Attach the rack ears to the front rack posts, using the screws (rack post screws not
provided).
Connect Power Supplies, Alarm Relay, and Ground Connection
Use the following sections to connect the power supplies, alarm relay, and ground
connection.
ISW Series Managed Industrial Ethernet Switch Hardware Installation Guide
Mounting the ISW (Two-Post Rack)
37