3
Configuring a multi-path Crypto LUN
Multi-path LUN configuration example
Figure 89
a dual-port host. The two encryption switches form an encryption group and an HA cluster. The
following example illustrates a simplified version of a multi-path LUN configuration.
FIGURE 89
The following steps may be used to configure multiple path access to the LUN in
1. Create zoning between host port 1 and target port 1. Refer to the section
2. Create zoning between host port 2 and target port 2. Refer to the section
3. On the group leader encryption switch (switch 1), create a CryptoTarget container for each
180
on page 180 shows a single LUN on a dual-port target that is accessed over two paths by
A LUN accessible through multiple paths
- target zone"
on page 162 for instructions.
- target zone"
on page 162 for instructions.
target port and add the hosts in sequence. Do NOT commit the configuration until you have
created all CryptoTarget containers and added all hosts to the respective containers.
a. Log in as Admin or FabricAdmin.
b. Create a CryptoTarget container (CTC1) for target port 1 to be hosted on the encryption
engine of encryption switch 1. Refer to the section
page 167 for instructions on steps b. through e.
FabricAdmin:switch> cryptocfg --create -container disk CTC1 \
<switch 1 WWN> 0 <Target Port 1 WWN> <Target NWWN>
"Creating a CryptoTarget container"
Fabric OS Encryption Administrator's Guide (SKM/ESKM)
Figure
89.
"Creating an initiator
"Creating an initiator
on
53-1002721-01