Omron CP1H-CPU - 05-2006 Operation Manual page 137

Cp1h cpu unit
Table of Contents

Advertisement

Installation Precautions
Accessibility for
Operation and
Maintenance
!Caution Do not touch the power supply or the area around the I/O terminals while
!Caution After the power supply has been turned OFF, wait until the PLC has suffi-
Improving Noise
Resistance
Mounting in a Panel
106
• To ensure safe access for operation and maintenance, separate the PLC
as much as possible from high-voltage equipment and moving machinery.
• The PLC will be easiest to install and operate if it is mounted at a height of
about 1,000 to 1,600 mm.
power is being supplied or immediately after power has been turned OFF.
Doing so may result in burns.
ciently cooled before touching it.
• Do not mount the PLC in a control panel containing high-voltage equip-
ment.
• Install the PLC at least 200 mm from power lines.
Power lines
200 mm
min.
SYSMAC CP1H
• Ground the mounting plate between the PLC and the mounting surface.
• The CP1H must be installed in the orientation shown below to ensure
adequate cooling.
200 mm min.
Section 3-2

Advertisement

Table of Contents
loading

Table of Contents