#&KDSWHU#;#±#,QVWDOODWLRQ#3URFHGXUHV
886063540543
6WDQGDUG#8133
3URFHGXUH#5
1HZ#V\VWHP#LQVWDOODWLRQ
4
,QVWDOO#WKH#0DLQ#&DELQHW
a) Mount the cabinets as described in "Chapter 9 – Mounting the
cabinets" on page 103.
b) Remove the drip tray from each cabinet to expose the cable
routing grooves at the bottom rear of the cabinet.
c) Install the cabinet ground wire for the main cabinet as
described in "Chapter 10 – Installing the system ground"
on page 113.
d) Install the power supply as described in "Chapter 11–
Installing the power supplies" on page 119.
e) Install the reserve power supply if required.
Refer to "Chapter 16 – Installing and connecting reserve
power supplies" on page 179.
f)
Install a Cable Routing Guide if this is a multi-cabinet system.
Refer to "Chapter 8 – Installation Procedures" on page 97.
g) Install the System Controller Card, daughterboards and
related components. Refer to "Chapter 12 – Installing the
System Controller Card and Components" on page 131".
h) Install the remaining circuit cards. Refer to "Chapter 15 –
Installing the circuit cards" on page 165.
i)
Install the cross-connect terminal and Cables. Refer to
"Chapter 13 – Installing and connecting cross-connect
terminals to cabinets" on page 147.
j)
Install the power fail transfer units (PFTUs) if provided. Refer
to "Chapter 14 – Installing power fail transfer units" on
page 159.
k) Connect the SDI and ethernet interfaces Refer to "Chapter 17
– Installing and connecting SDI and ethernet ports" on
page 193