&KDSWHU#:#±#3UHSDULQJ#IRU#LQVWDOODWLRQ
*HQHUDO#LQIRUPDWLRQ
7RROV#FKHFNOLVW
Before proceeding with the installation, make sure you have all the tools
necessary to install the Option 11C. Next, make sure you have checked for all
site requirements, received all equipment, and that you have prepared an
equipment layout plan and card slot assignment plan.
To properly install the system, make sure that the following tools are
available before starting to assemble the components:
•
a variety of screwdrivers
•
a tape measure
•
a level
•
pliers such as side cutters and longnose pliers
•
an ECOS 1023 POW-R-MATE or similar type test meter
•
appropriate cable terminating tools
•
a drill for drilling lead holes for screws
2SWLRQ#44&
3ODQQLQJ#DQG#,QVWDOODWLRQ#*XLGH
3DJH#<8#RI#699