Installing The Front Cover - Fujitsu M10-4 Service Manual

Hide thumbs Also See for M10-4:
Table of Contents

Advertisement

b. Remove the screw securing the cable holder, and then rotate the cable holder
c. Connect all the crossbar cables to the crossbar unit.
d. Use the hook-and-loop fastener to fix the crossbar cables in place to the cable
Procedure when equipment rack model 16xx is used
a. Remove the crossbar cables from the hook-and-loop fastener installed on the
b. Connect all the crossbar cables to the crossbar unit.
c. Use the hook-and-loop fastener to fix the crossbar cables in place to the cable
Note - Connect the crossbar cables in their original positions by referring to the notes that
you made before the start of maintenance.
6.1.5

Installing the front cover

If the front cover of the SPARC M10-4/M10-4S was removed for maintenance to
install a FRU at the front of or inside the chassis, install the front cover after installing
the FRU.
1.
To install the front cover, insert the tabs of the front cover into the notches at
the bottom front of the chassis.
holder.
by 180 degrees to install it on the supporting column at the rear of the rack.
For details, see
"14.4 Installing the Crossbar
support.
supporting column at the rear of the rack.
For details, see
"14.4 Installing the Crossbar
support.
Cables."
Cables."
Chapter 6 Restoring the System
109

Advertisement

Table of Contents
loading

This manual is also suitable for:

M10-4sSparc m10-4Sparc m10-4s

Table of Contents